Network Working Group
RFC #334
NIC 9927
RFC #334
NIC 9927
Alex McKenzie
BBN
1 May 1972
BBN
1 May 1972
Network Use on MAY 8
Vint Cerf of UCLA Network Measurement Center has just indicated to us a requirement to carry out certain performance experiments on the network prior to installation of the new IMP software on May 15. These experiments are designed to measure network performance under heavy traffic load to a single site, and thus may cause the network to "lock up" such that _no_ traffic can flow (a problem which the new IMP software is de- signed to prevent). Vint has indicated to us that ARPA regards these experiments as extremely important in spite of the possibility of lockup; we have therefore agreed to assist with the experiments and scheduled them for May 8. Although we do not know whether these experiments will cause lockup, we suggest that sites do not schedule important network work for Monday, May 8. We apologize for the lateness of this announcement. [ This RFC was put into machine readable form for entry ] [ into the online RFC archives by BBN Corp. under the ] [ direction of Alex McKenzie. 12/96 ]